Project Snapshot
PRISM Project #00-1690 (Completed)
Whiskey Creek Restoration
    Project Details    
Mike Fletcher; Whiskey Creek Restoration (#00-1690) 06/20/2002, Attachment #2260, Dam, after removal

Project Status:  Closed Completed since 11/13/2002
 
Project Type:  Restoration
Project Sponsor:  Mike Fletcher
Funding Board:  Salmon Recovery Funding Board
              Funding  
Salmon Federal Projects: $56,665
Total RCO Grant: $56,665 (85%)
Sponsor Match: $10,000 (15%)
Total Agreement: $66,665 (100%)
              Links
 

    Project Description    
Whiskey Creek is a tributary to the Touchet River in WRIA 32 and is home to ESA listed stocks of summer steelhead and bull trout. It is currently blocked to upstream passage by a concrete barrier at river mile 1. Currently, water temperatures do no exceed 70F at the barrier and flows are estimated to be 2 cfs. The purpose of this project is to modify the barrier to allow for upstream passage at all flows and for all age classes of salmonids, making more that 10 miles of useable spawning and rearing habitat accessable. In addition, woody debris will be placed in the channel over a distance of 0.4 miles to compliment instream rearing habitat, recruit spawning gravels and provide velocity refuge during high flow events. Riparian trees will also be planted in the 0.4 miles to maintain cool water temperatures and provide large woody debris recruitment for future years. Lastly, a surface-water pump, with a water right of 0.5 CFS will be screened.
The Confederated Tribe of the Umatilla Indian Reservation will provide $5,000 towards modifying the barrier to allow upstream passage. The CREP program will be used as a $5,000 cost share towards the project. The project is 0.4 miles long and 360 feet wide (17 acres), and will be enrolled in CREP for 15 years.

    Project Contacts    
         
Project Sponsor: Mike Fletcher Lead Entity: Snake River Salmon Recovery Board Lead Entity
  Project Contact: Steve Martin
steve@snakeriverboard.org
(509) 386-4748
   
 
Funding Agency: Recreation and Conservation Office    
  Project Manager: Kendall Kohler
Kendall.Kohler@rco.wa.gov
(360) 764-9086
   

    Project Location    
General Area:   Whiskey Creek
County:   Columbia
Legislative District:   09
Congressional District 2022:   05
Salmon Recovery Regions:   Snake River
Watershed Administrative Unit:   Walla Walla Agricultural Lands
HUC8:   Walla Walla (17070102)
WRIA:   Walla Walla
Sections:   07
Township:   T09NR38E
Coordinates:   46.26749994
-118.10584631

    Worksites    
Worksite NameScope of WorkActual Restoration Cost
Whiskey Creek (#1) Channel structure placement (C.4.d.1), Fish passage blockages removed or altered (C.2.c.1), Fishway chutes or pools installed (C.2.d.1), Planting (C.5.c.1) $66,665
 Total$66,665
Amounts may not be complete

    Properties    
Worksite Name Property NameLandowner Type
Whiskey Creek (#1)   Property 1 - Mike Fletcher Private
   Total
Amounts may not be complete

    Project Metrics (Outcomes, Benefits)    
 Category / Work Type / MetricFinal

Restoration Metrics (rolled up from Worksite level)

Fish Passage Improvement
      Fish passage blockages removed or altered (C.2.c.1)
Number of Blockages/Impediments/Barriers Removed/Altered (C.2.c.2) 1
      Fishway chutes or pools installed (C.2.d.1)
Number Of Fishway Chutes/Pools Installed (C.2.d.2) 1

Instream Habitat Project
      Channel structure placement (C.4.d.1)
Miles of Stream Treated for channel structure placement (C.4.d.3) 0.40
Acres Of Streambed Treated for channel structure placement (C.4.d.4) 0.3
Pools Created through channel structure placement (C.4.d.5) 23
Number of structures placed in channel (C.4.d.7) 23

Riparian Habitat Project
      Planting (C.5.c.1)
Acres Planted in riparian (C.5.c.3) 2.0

Fish Passage Improvement
      
Number of blockages / impediments / barriers impeding passage (C.2.b.4) 1

    Project Milestones    
Milestone NameTarget DateDescription
Project Start 06/01/2001 Mike Fletcher to do
RFP Complete 06/01/2001 Mike Fletcher to do
Applied for Permits 06/01/2001 Steve Martin, WDFW, to do B.A. and HPA
A&E Plans Submitted 06/01/2001 Bruce Heiner, WDFW engineer
Monitor/Steward Plan Submitted 06/01/2001 Steve Martin, WDFW to do
Bid Awarded/Consultant Hired 06/01/2001 Mike Fletcher to do
Monitoring Started 09/01/2001 Steve Martin, WDFW to do
Construction Started 09/01/2001 Mike Fletcher to do
Construction Complete 09/30/2001 Mike Fletcher to do
Monitoring Complete 12/01/2001 Steve Martin, WDFW to do
Agreement End Date 12/01/2001 Mike Fletcher to do
Final Docs/Billing to Mgmt Agy 03/01/2002 Mike Fletcher to do


    Project Attachments    
Attachment TypeAttachment TitleAttach Date
Final project report Final Report .pdf 10/14/2012
Final project report Development Final Report.pdf 04/26/2012
Photo whiskey after.jpg 10/21/2012
Photo Before, lower reach.jpg 10/09/2002
Photo After, lower reach.jpg 10/09/2002
Photo Before, high bank.jpg 10/09/2002
Photo After, high bank.jpg 10/09/2002
Photo Before, LWD & rock placed.jpg 10/09/2002
Photo After, LWD & rocks placed.jpg 10/09/2002
Photo Dam, before removal.jpg 10/09/2002
Photo Dam, after removal.jpg 10/09/2002