Manage to get hold of the tender Documents since my Father has a account...
Main Points of TSL Doc
1.) 4 cars MRT train
2.) 30 Km from Woodlands to Marina Bay Area
3.) Third Rail powered, Automatic Driverless
5.) Each car has 10 doors instead of the usual 8
6.) 90 cars will ply on the TSL ( Note: They will first start with 35 trains and the
other 55 will be for future expansion)
7.) A bus Depot will be place on top of the TSL Depot.
8.) TSL Depot will be at Grade.
9.) Location of TSL Depot unkown. (Near Orchidville?)
10.) TS1 will be an interchange (Woodlands)---(1.428km)-->TS2---(1.368km)---
>TS3---(Depot)--------------(I only know Phase1 of TSL)
11.) Thats All...
Just some screen shot to provide better detail on point 10...
![]()
Ok, today LTA released its TSL Mainline Package B on the tender site. More information for you all:
As you know from previous Mainline package A(4.2km) it consists of 3 stations and a depot (1 interchange, 2-non CD station)---> As you all know i uploaded the indicative track alignment.(Check previous post)
So, lets get back to the point. This Mainline Package B consists of 8 stations:
From the tender document : (Mainline Package B 14.5km)
T4: Future Station (Note: It means stations that are not going to be built. Instead a station box will be placed for the future)
T4A: Future station (Why is the code T4A? I have no idea)
T5: CD station
T6: CD station
T7: Interchange + CD (This station will interchange with a future line, so this station will be just a normal CD station initially) ---> Interchange will be cross platform.
T8: Normal station
T9: Interchange (This station will interchange with an existing line) --->Interchange will be using paid to paid link
T10: Future station
This time round LTA did not provide the indicative track alignment. All I know is that this part B of TSL is about 14.5km.
That’s All!
So today LTA released the Mainline Package C from T11 to T16 (excludes T12)
(In total there are 4 packages. 3 of them have been released. Check previous posts for packages A and B)
Details of Package C (6 km)
T11: Interchange + CD
T13: Normal Station
T14: Interchange + CD
T15: Normal Station
T16: Normal Station
Notes: T12 will be designed by LTA In-house Design Team. Thus it is not included above.
A/E shall pay attention to design of station T13 and T14 to avoid cutting trees. (Stated in Tender Doc.)
Package C from T11 to T16 is 6km.(Track Alignment not given)
Enjoy :cheers:
Manage to get hold of the tender Documents since my Father has a account...
Main Points of TSL Doc
1.) 4 cars MRT train
2.) 30 Km from Woodlands to Marina Bay Area
3.) Third Rail powered, Automatic Driverless
5.) Each car has 10 doors instead of the usual 8
6.) 90 cars will ply on the TSL ( Note: They will first start with 35 trains and the
other 55 will be for future expansion)
7.) A bus Depot will be place on top of the TSL Depot.
8.) TSL Depot will be at Grade.
9.) Location of TSL Depot unkown. (Near Orchidville?)
10.) TS1 will be an interchange (Woodlands)---(1.428km)-->TS2---(1.368km)---
>TS3---(Depot)--------------(I only know Phase1 of TSL)
11.) Thats All...
Just some screen shot to provide better detail on point 10...
Ok, today LTA released its TSL Mainline Package B on the tender site. More information for you all:
As you know from previous Mainline package A(4.2km) it consists of 3 stations and a depot (1 interchange, 2-non CD station)---> As you all know i uploaded the indicative track alignment.(Check previous post)
So, lets get back to the point. This Mainline Package B consists of 8 stations:
From the tender document : (Mainline Package B 14.5km)
T4: Future Station (Note: It means stations that are not going to be built. Instead a station box will be placed for the future)
T4A: Future station (Why is the code T4A? I have no idea)
T5: CD station
T6: CD station
T7: Interchange + CD (This station will interchange with a future line, so this station will be just a normal CD station initially) ---> Interchange will be cross platform.
T8: Normal station
T9: Interchange (This station will interchange with an existing line) --->Interchange will be using paid to paid link
T10: Future station
This time round LTA did not provide the indicative track alignment. All I know is that this part B of TSL is about 14.5km.
That’s All!
So today LTA released the Mainline Package C from T11 to T16 (excludes T12)
(In total there are 4 packages. 3 of them have been released. Check previous posts for packages A and B)
Details of Package C (6 km)
T11: Interchange + CD
T13: Normal Station
T14: Interchange + CD
T15: Normal Station
T16: Normal Station
Notes: T12 will be designed by LTA In-house Design Team. Thus it is not included above.
A/E shall pay attention to design of station T13 and T14 to avoid cutting trees. (Stated in Tender Doc.)
Package C from T11 to T16 is 6km.(Track Alignment not given)
Enjoy :cheers:
Marine Parade Station underground shopping street
View attachment 10391157
TOP issued for Phase 1 so expecting shops and facilities to open in the next few months