TOTAN : Here's the original development schedule. Jim Patla, a legend in his own right, was our engineering manager and tracked multiple projects while herding all the cats from start to finish. He took a lot of shit from everyone, but he's an unsung hero in the 90's Williams/Bally era.
November 24, 2024 at 7:45 AM
2 reposts
11 likes
All my notes reference XY1, XY2, etc which was the internal notation for a whitewood. ("XY" meaning an AutoCAD layout full of two-dimensional coordinates being loaded into a computerized drilling machine on a blank playfield).