PATHFINDER

Permanent Shutdown


Reactor Details

Reactor Type Model Owner Operator
BWR
Prototype
Xcel Energy
NUCLEAR MANAGEMENT CO.
Reference Unit Power (Net Capacity) Design Net Capacity Gross Capacity Thermal Capacity
59 MWe
59 MWe
63 MWe
220 MWt
Construction Start Date First Criticality Date
01 Jan, 1959
01 Jan, 1964
First Grid Connection Commercial Operation Date
25 Jul, 1966
01 Aug, 1966
Permanent Shutdown Date
01 Oct, 1967

LifeTime Performance

Electricity Supplied Energy Availability Factor Operation Factor Energy Unavailability Factor Load Factor
NC
NC
NC
NC
NC
Lifetime performance calculated up to year 1967

Operating History

Year Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual Cumulative Annual Cumulative
1966 Data from a trial operation not provided
1967 0 59 0
Performance indicators are calculated from the Commercial Operation Date.
NC – cumulative values not calculated when more than 50% of required data is missing in PRIS


Above data generated by the PRIS database. Last update on 2023-06-09

Previous  (PALO VERDE-3) (PEACH BOTTOM-1)  Next