Red Hat provides support and maintenance over stated time periods for the major versions of Red Hat Application Services products (i.e., EAP versions 5.x, 6.x, and 7.x). The published life cycle calendars for Red Hat Application Services products allow customers and partners to effectively plan, deploy, and support Red Hat Application Services products.
The life cycle associated with a Red Hat Application Services product identifies the various levels of maintenance for each release of that product over a period of time from the initial release—or general availability (GA)—to the end of the maintenance phase. Red Hat Application Services product life cycles are generally three, five, or seven years in length, depending on the product. For certain Red Hat Application Services products (as described below), an optional add-on Extended Life Cycle Support (ELS) subscription may be purchased to extend the life cycle by three (3) additional years.
Software updates to Red Hat Application Services products, if and when available, are delivered via software patches. Patches can be released individually on an as-needed basis, aggregated as part of a Cumulative Patch (CP), or included in a minor release (e.g., EAP version 7.3). Patches may contain security and/or bug fixes. Feature enhancements are generally introduced in minor and major releases—not as patches or in CPs. Red Hat's goal is to maintain compatibility across the full life cycle of a product family (e.g., EAP 7.x patches, EAP 7.x CPs, and EAP 7.x minor releases are in the same EAP 7 product family). Patches, CPs, and minor releases are tested and qualified against prior releases for a given product family. Red Hat will use commercially reasonable efforts to provide compatibility with the initial major release (e.g., EAP 7.0). Where incompatibilities arise, they will be documented in the release notes or may be reported as bugs.
NOTE: Defect and security fixes are only provided for the latest Minor, Micro or CP release, therefore upgrading to the latest release is required in order to receive the current updates. Additionally, upgrades and patches are expected to be applied to a supported configuration as published.
Red Hat Application Services life cycles are designed to reduce the level of change within each major release over time, increasing predictability and decreasing maintenance costs. Released patches, CPs, and minor releases will remain accessible to active subscribers for the entire life cycle of a product family. Red Hat publishes product life cycle calendars in an effort to provide as much transparency as possibly but may make exceptions from these policies if unforeseeable conflicts arise (such as the end-of-life (EOL) of a dependent component or platform) that are outside of Red Hat’s control.
Each major version of a Red Hat Application Services product has its own life cycle that will include one or more minor releases and related patch updates. During the entire life cycle, Red Hat makes commercially reasonable efforts to maintain API-level compatibility across all minor releases and asynchronous patches (e.g., EAP 7.1 will maintain API-level compatibility with EAP 7.0, the parent release of the EAP 7 family). Possible exceptions to this rule could include fixes introduced to address Critical impact security issues. Furthermore, major versions of Red Hat Application Services products endeavor to maintain significant backward-compatibility with previous versions (e.g., EAP 7.0 endeavors to maintain significant backward compatibility with EAP 6.x) to aid with the migration of applications from one major release to another.
The life cycle for a major release of Red Hat Application Services products is divided into three primary phases: the Full Support Phase, the Maintenance Phase, and the Extended Life Phase.
Phase 1: Full Support
Start Date: General Availability
Full support is provided according to the published Scope of Coverage and Service Level Agreement. Likewise, Development Support is provided according to the published Scope of Coverage and Service Level Agreement. All available and qualified patches will be applied via periodic product updates and CPs, or as required for qualified security patches.
Phase 2: Maintenance Support
Start Date: no less than one (1) year after General Availability.
Production support is provided according to the published Scope of Coverage and Service Level Agreement. Likewise, Development Support is provided according to the published Scope of Coverage and Service Level Agreement. During the maintenance phase, qualified security patches of Critical or Important impact, as well as select mission-critical bug-fix patches, will be released.
Phase 3: Extended Life Support
Extended Life support is provided according to the published Scope of Coverage and Service Level Agreement. Unlike our Full Support and Maintenance Support phases, this support phase requires an ELS subscription in addition to a supported product’s base subscription. Extended Life Support subscriptions of Red Hat Application Services products provide decreasing support and maintenance over time as described below.
Troubleshooting for Application Services product releases in the ELS Life Cycle Phase is limited to the latest minor release. NOTE: The above policy will not apply to customers who had active subscriptions, as of the date of this change (see the Change Log), until February 28, 2022.
ELS-1 delivers Critical impact security fixes and selected urgent-priority bug fixes, if and when available. For ELS-1 subscribers, Red Hat will generally continue to proactively provide the Critical impact security fixes if and when available independent of customer requests. ELS-1 is generally available for 3 years following the end of Maintenance Support.
ELS-2:
ELS-2 support is offered after the end of the ELS-1. ELS-2 provides limited ongoing technical support to include: Advice and guidance for migrating to current product releases, problem evaluation and workarounds. Bug fixes, security fixes, hardware enablement or root-cause analysis (other than to determine possible workarounds) are not available during this phase, and support is limited to existing installations only.
The duration of ELS-2 support is scheduled for 3 years and may be extended on a product-by-product basis. Red Hat reserves the right to terminate the ongoing support in the ELS-2 for a particular product at any time beyond the initial 3 year period.
The following table details each type of software maintenance performed during a typical life cycle:
Full details of support services are provided as part of the Subscription Agreement.
Red Hat can choose to address catastrophic issues with significant business impact for the customer through a hotfix, as a temporary measure while the bug-fix patch is being created.
Major and Minor releases are the primary source for software enhancements. Rollups, updates, and patches are specifically reserved for bug fixes.
Red Hat provides Critical impact security fixes and selected urgent-priority bug fixes, if and when available. Additionally, Red Hat will generally continue to proactively provide the Critical impact security fixes if and when available independent of customer requests.
Red Hat Application Services product life cycles are generally three, five, or seven years in length as described below.
Long-life Product Life Cycle
A Long-life Product Life Cycle of seven years is generally applied to foundation products, such at Red Hat JBoss Enterprise Application Platform. As depicted below, the seven-year cycle includes four years of Full Support and three years of Maintenance Support. Extensions beyond the seventh year (“Extended Life Support”) are available under a separate subscription, scope of coverage, and SLA.
Long-life Product Life Cycle
Phase 1 Full Support (4 years)
Phase 2 Maintenance Support (3 years)
Phase 3 Extended Life Support (3-6 years)
Year 1
Year 2
Year 3
Year 4
Year 5
Year 6
Year 7
Year 8
Year 9
Year 10
Year 11
Year 12
Year 13
Standard Product Life Cycle
A Standard Product Life Cycle of five years applies to most Red Hat Application Services products. The Standard Product Life Cycle is also composed of two phases, Full Support and Maintenance Support. Extensions beyond the fifth year (“Extended Life Support”) are available under a separate subscription, scope of coverage, and SLA.
Standard Product Life Cycle
Phase 1 Full Support (3 years)
Phase 2 Maintenance Support (2 years)
Phase 3 Extended Life Support (3-6 years)
Year 1
Year 2
Year 3
Year 4
Year 5
Year 6
Year 7
Year 8
Year 9
Year 10
Year 11
Limited Product Life Cycle
The Limited Product Life Cycle of three years is generally applied to newer product areas and rapidly changing technologies such as development frameworks. The Limited Product Life Cycle is only composed of one phase, the Full Support Phase, however, variations may include a Maintenance Phase for some product releases. Extensions beyond the third year (“Extended Life Support”) are available under a separate subscription, scope of coverage, and SLA.
Listed below are the life cycle dates for all currently supported Red Hat Application Services products. Life cycle dates for product releases that have reached their end of support life can be found on the Archived JBoss Product Life Cycle Information page.
Red Hat JBoss Enterprise Application Platform
Red Hat JBoss Enterprise Application Platform
Version
一般提供の開始 (GA) 日
フルサポートの終了日
メンテナンスサポートの終了日
延長ライフサイクルサポート (ELS) 1 の終了日
延長ライフサイクルサポート (ELS) 2 の終了日
Full support Red Hat JBoss Enterprise Application Platform
Version
一般提供の開始 (GA) 日
フルサポートの終了日
メンテナンスサポートの終了日
延長ライフサイクルサポート (ELS) 1 の終了日
延長ライフサイクルサポート (ELS) 2 の終了日
7.x
May 1, 2016
June 30, 2022
June 30, 2024
November 30, 2026
November 30, 2029
Extended support Red Hat JBoss Enterprise Application Platform
Version
一般提供の開始 (GA) 日
フルサポートの終了日
メンテナンスサポートの終了日
延長ライフサイクルサポート (ELS) 1 の終了日
延長ライフサイクルサポート (ELS) 2 の終了日
6.x
June 1, 2012
June 30, 2016
June 30, 2019
June 30, 2022
June 30, 2025
5.x
November 1, 2009
November 30, 2013
November 30, 2016
November 30, 2019
November 30, 2022
End of life Red Hat JBoss Enterprise Application Platform
Version
一般提供の開始 (GA) 日
フルサポートの終了日
メンテナンスサポートの終了日
延長ライフサイクルサポート (ELS) 1 の終了日
延長ライフサイクルサポート (ELS) 2 の終了日
4.3
January 1, 2008
January 31, 2011
January 31, 2013
November 30, 2016
November 30, 2019
4.2
June 1, 2007
June 30, 2010
June 30, 2012
June 30, 2015
June 30, 2018
JBoss Enterprise Application Platform expansion pack (JBoss EAP XP or EAP XP)
Note: Spring Boot 2.2 support will end when the Spring Community upstream version 2.2 has reached End of Life.
Red Hat build of Node.js
Red Hat build of Node.js
Version
一般提供の開始 (GA) 日
フルサポートの終了日
Full support Red Hat build of Node.js
Version
一般提供の開始 (GA) 日
フルサポートの終了日
14.x LTS
November 3, 2020
April 30, 2023
12.x LTS
February 21, 2020
April 30, 2022
End of life Red Hat build of Node.js
Version
一般提供の開始 (GA) 日
フルサポートの終了日
10.x LTS
April 1, 2018
April 30, 2021
8.9+
March 1, 2018
December 31, 2019
Node.js support aligns with the Node.js LTS life cycle dates defined by the Node.js Release Working Group, generally consisting of 18 months of full support followed by 12 months of maintenance support.
Red Hat build of Thorntail
Red Hat build of Thorntail
Version
一般提供の開始 (GA) 日
フルサポートの終了日
End of life Red Hat build of Thorntail
Version
一般提供の開始 (GA) 日
フルサポートの終了日
2.x
November 1, 2017
May 31, 2021
Red Hat build of Eclipse Vert.x
Red Hat build of Eclipse Vert.x
Version
一般提供の開始 (GA) 日
フルサポートの終了日
Full support Red Hat build of Eclipse Vert.x
Version
一般提供の開始 (GA) 日
フルサポートの終了日
4.x
January 7, 2021
January 31, 2023
End of life Red Hat build of Eclipse Vert.x
Version
一般提供の開始 (GA) 日
フルサポートの終了日
3.x
November 1, 2017
March 31, 2021
Red Hat build of Quarkus
Red Hat build of Quarkus
Version
一般提供の開始 (GA) 日
フルサポートの終了日
Full support Red Hat build of Quarkus
Version
一般提供の開始 (GA) 日
フルサポートの終了日
1.x
April 20, 2020
Release of 2.x + 1 month
Red Hat Fuse
Red Hat Fuse
Version
一般提供の開始 (GA) 日
フルサポートの終了日
メンテナンスサポートの終了日
ライフサイクル終了日
延長ライフサイクルサポート (ELS) 1 の終了日
延長ライフサイクルサポート (ELS) 2 の終了日
Full support Red Hat Fuse
Version
一般提供の開始 (GA) 日
フルサポートの終了日
メンテナンスサポートの終了日
ライフサイクル終了日
延長ライフサイクルサポート (ELS) 1 の終了日
延長ライフサイクルサポート (ELS) 2 の終了日
7.x
May 30, 2018
June 30, 2022
June 30, 2024
June 30, 2024
June 30, 2026
該当なし
Maintenance support Red Hat Fuse
Version
一般提供の開始 (GA) 日
フルサポートの終了日
メンテナンスサポートの終了日
ライフサイクル終了日
延長ライフサイクルサポート (ELS) 1 の終了日
延長ライフサイクルサポート (ELS) 2 の終了日
6.x
April 1, 2013
July 31, 2018
January 31, 2022
January 31, 2022
January 31, 2024
January 31, 2025
Red Hat JBoss Fuse Service Works
Red Hat JBoss Fuse Service Works
Version
一般提供の開始 (GA) 日
フルサポートの終了日
メンテナンスサポートの終了日
ライフサイクル終了日
延長ライフサイクルサポート (ELS) 1 の終了日
延長ライフサイクルサポート (ELS) 2 の終了日
Extended support Red Hat JBoss Fuse Service Works
Version
一般提供の開始 (GA) 日
フルサポートの終了日
メンテナンスサポートの終了日
ライフサイクル終了日
延長ライフサイクルサポート (ELS) 1 の終了日
延長ライフサイクルサポート (ELS) 2 の終了日
6.x
February 1, 2014
January 31, 2017
January 31, 2019
January 31, 2019
January 31, 2022
January 31, 2025
Red Hat AMQ
Red Hat AMQ
Version
一般提供の開始 (GA) 日
フルサポートの終了日
メンテナンスサポートの終了日
ライフサイクル終了日
延長ライフサイクルサポート (ELS) 1 の終了日
延長ライフサイクルサポート (ELS) 2 の終了日
Full support Red Hat AMQ
Version
一般提供の開始 (GA) 日
フルサポートの終了日
メンテナンスサポートの終了日
ライフサイクル終了日
延長ライフサイクルサポート (ELS) 1 の終了日
延長ライフサイクルサポート (ELS) 2 の終了日
7.x
May 30, 2017
June 30, 2022
June 30, 2024
June 30, 2024
November 30, 2026
November 30, 2029
Maintenance support Red Hat AMQ
Version
一般提供の開始 (GA) 日
フルサポートの終了日
メンテナンスサポートの終了日
ライフサイクル終了日
延長ライフサイクルサポート (ELS) 1 の終了日
延長ライフサイクルサポート (ELS) 2 の終了日
6.x
April 1, 2013
July 31, 2018
January 31, 2022
January 31, 2022
January 31, 2024
January 31, 2025
Note: Please see the Knowledge Base article, "How long are AMQ LTS releases supported?" for details about AMQ 7.x (LTS) component Life Cycle support details. Note: AMQ Online End-of-Life is scheduled for June 30, 2023.
Red Hat 3scale API Management Platform
Red Hat 3scale API Management Platform
Version
一般提供の開始 (GA) 日
フルサポートの終了日
メンテナンスサポートの終了日
ライフサイクル終了日
Full support Red Hat 3scale API Management Platform
Version
一般提供の開始 (GA) 日
フルサポートの終了日
メンテナンスサポートの終了日
ライフサイクル終了日
2.x
April 2, 2017
June 30, 2022
June 30, 2024
June 30, 2024
Red Hat JBoss Data Virtualization
Red Hat JBoss Data Virtualization
Version
一般提供の開始 (GA) 日
フルサポートの終了日
メンテナンスサポートの終了日
ライフサイクル終了日
延長ライフサイクルサポート (ELS) 1 の終了日
延長ライフサイクルサポート (ELS) 2 の終了日
Extended support Red Hat JBoss Data Virtualization
Version
一般提供の開始 (GA) 日
フルサポートの終了日
メンテナンスサポートの終了日
ライフサイクル終了日
延長ライフサイクルサポート (ELS) 1 の終了日
延長ライフサイクルサポート (ELS) 2 の終了日
6.x
February 1, 2014
January 31, 2018
January 31, 2020
January 31, 2020
January 31, 2023
該当なし
Red Hat Process Automation Manager (formerly Red Hat JBoss BPM Suite)
Red Hat Process Automation Manager (formerly Red Hat JBoss BPM Suite)
Version
一般提供の開始 (GA) 日
フルサポートの終了日
メンテナンスサポートの終了日
ライフサイクル終了日
延長ライフサイクルサポート (ELS) 1 の終了日
延長ライフサイクルサポート (ELS) 2 の終了日
Full support Red Hat Process Automation Manager (formerly Red Hat JBoss BPM Suite)
Version
一般提供の開始 (GA) 日
フルサポートの終了日
メンテナンスサポートの終了日
ライフサイクル終了日
延長ライフサイクルサポート (ELS) 1 の終了日
延長ライフサイクルサポート (ELS) 2 の終了日
7.x
May 30, 2018
May 31, 2022
May 31, 2024
May 31, 2024
May 31, 2026
May 31, 2029
Extended support Red Hat Process Automation Manager (formerly Red Hat JBoss BPM Suite)
Version
一般提供の開始 (GA) 日
フルサポートの終了日
メンテナンスサポートの終了日
ライフサイクル終了日
延長ライフサイクルサポート (ELS) 1 の終了日
延長ライフサイクルサポート (ELS) 2 の終了日
6.x
February 1, 2014
July 31, 2017
December 31, 2019
December 31, 2019
December 31, 2022
December 31, 2025
Note: Entando App Manager Included. Entando App Manager follows a 3 year life cycle. Entando App Manager 5.x full support from May 2018 to May 2020. Maintenance support from May 2020 to May 2021
Note: Support for containerization of product bits is discontinued for 6.x from ELS-1 onward. Please note health index grades are not maintained henceforth.
Red Hat Decision Manager (Formerly Red Hat JBoss BRMS)
Red Hat Decision Manager (Formerly Red Hat JBoss BRMS)
Version
一般提供の開始 (GA) 日
フルサポートの終了日
メンテナンスサポートの終了日
ライフサイクル終了日
延長ライフサイクルサポート (ELS) 1 の終了日
延長ライフサイクルサポート (ELS) 2 の終了日
Full support Red Hat Decision Manager (Formerly Red Hat JBoss BRMS)
Version
一般提供の開始 (GA) 日
フルサポートの終了日
メンテナンスサポートの終了日
ライフサイクル終了日
延長ライフサイクルサポート (ELS) 1 の終了日
延長ライフサイクルサポート (ELS) 2 の終了日
7.x
February 28, 2018
May 31, 2022
May 31, 2024
May 31, 2024
May 31, 2026
May 31, 2029
Extended support Red Hat Decision Manager (Formerly Red Hat JBoss BRMS)
Version
一般提供の開始 (GA) 日
フルサポートの終了日
メンテナンスサポートの終了日
ライフサイクル終了日
延長ライフサイクルサポート (ELS) 1 の終了日
延長ライフサイクルサポート (ELS) 2 の終了日
6.x
February 28, 2014
April 30, 2018
December 31, 2019
December 31, 2019
December 31, 2022
December 31, 2025
End of life Red Hat Decision Manager (Formerly Red Hat JBoss BRMS)
Version
一般提供の開始 (GA) 日
フルサポートの終了日
メンテナンスサポートの終了日
ライフサイクル終了日
延長ライフサイクルサポート (ELS) 1 の終了日
延長ライフサイクルサポート (ELS) 2 の終了日
5.x
May 1, 2009
March 31, 2014
May 31, 2015
January 31, 2015
January 31, 2019
January 31, 2021
Note: Support for containerization of product bits is discontinued for 6.x from ELS-1 onward. Please note health index grades are not maintained henceforth.
Red Hat JBoss SOA Platform
Red Hat JBoss SOA Platform
Version
一般提供の開始 (GA) 日
フルサポートの終了日
メンテナンスサポートの終了日
ライフサイクル終了日
延長ライフサイクルサポート (ELS) 1 の終了日
延長ライフサイクルサポート (ELS) 2 の終了日
Extended support Red Hat JBoss SOA Platform
Version
一般提供の開始 (GA) 日
フルサポートの終了日
メンテナンスサポートの終了日
ライフサイクル終了日
延長ライフサイクルサポート (ELS) 1 の終了日
延長ライフサイクルサポート (ELS) 2 の終了日
5.x
February 1, 2010
March 31, 2014
November 30, 2016
November 30, 2016
November 30, 2018
November 30, 2021
End of life Red Hat JBoss SOA Platform
Version
一般提供の開始 (GA) 日
フルサポートの終了日
メンテナンスサポートの終了日
ライフサイクル終了日
延長ライフサイクルサポート (ELS) 1 の終了日
延長ライフサイクルサポート (ELS) 2 の終了日
4.2
February 1, 2008
February 28, 2011
February 28, 2013
February 28, 2013
該当なし
該当なし
4.3
October 1, 2008
October 31, 2011
October 31, 2013
October 31, 2013
November 30, 2016
該当なし
Note: SOA-P 5.X is also a supported version of any Fuse Service Works or Fuse Subscription. Published SOA-P Life Cycle policy provisions apply.
Listed below are the life cycle dates for all currently supported Red Hat JBoss Core Services Collection services. Life cycle dates for Core Service releases that have reached their end of support life can be found on the Archived JBoss Product Life Cycle Information page.
Red Hat Single Sign-On
Red Hat Single Sign-On
Version
一般提供の開始 (GA) 日
フルサポートの終了日
メンテナンスサポートの終了日
Full support Red Hat Single Sign-On
Version
一般提供の開始 (GA) 日
フルサポートの終了日
メンテナンスサポートの終了日
7.x
June 1, 2016
June 30, 2022
July 31, 2023
Apache HTTP Server
Apache HTTP Server
Version
一般提供の開始 (GA) 日
フルサポートの終了日
メンテナンスサポートの終了日
Maintenance support Apache HTTP Server
Version
一般提供の開始 (GA) 日
フルサポートの終了日
メンテナンスサポートの終了日
2.4.x
May 1, 2016
May 31, 2022
November 30, 2022
Note: Only the latest update of 2.4.x version of the Red Hat JBoss Core Services HTTP server is maintained.
Red Hat JBoss Operations Network
Red Hat JBoss Operations Network
Version
一般提供の開始 (GA) 日
フルサポートの終了日
メンテナンスサポートの終了日
ライフサイクル終了日
移行サポートの終了日
Extended support Red Hat JBoss Operations Network
Version
一般提供の開始 (GA) 日
フルサポートの終了日
メンテナンスサポートの終了日
ライフサイクル終了日
移行サポートの終了日
3.x
December 1, 2011
December 31, 2015
December 31, 2019
December 31, 2019
2022 年 6 月
End of life Red Hat JBoss Operations Network
Version
一般提供の開始 (GA) 日
フルサポートの終了日
メンテナンスサポートの終了日
ライフサイクル終了日
移行サポートの終了日
2.3
September 1, 2009
September 30, 2012
該当なし
September 30, 2012
該当なし
2.4
July 1, 2010
July 31, 2013
該当なし
July 31, 2013
該当なし
Note: As of October 2015 JON is no longer sold as a separate offering. After October 2015, all Application Services product subscription renewals will automatically include JON Management.
Note: Migration Support delivers Critical impact security fixes and selected urgent-priority bug fixes, if and when available. Red Hat will generally continue to proactively provide the Critical impact security fixes if and when available independent of customer requests.
Web Connectors
Family
GA
End of Full Support
End of Maintenance Support
1.2.461
May 2016
May 2022
Nov 2022
Note: The most recent version of the latest major release of Web Connectors is supported.
Apache Jsvc
Family
GA
End of Full Support
End of Maintenance Support
1.1.01
May 2016
May 2022
Nov 2022
Note: The most recent version of the latest major release of Apache Jsvc is supported.
Products that are not listed above are either no longer actively sold or have reached the end of their supported Life Cycle. For more information check the Archived JBoss Product Life Cycle Information page.
Change Log
Date
Change
Sep 24, 2021
Clarified that the policy about customers needing to be on the latest minor release of a product in order to receive troubleshooting support will not apply to customers with existing subscriptions until February 28, 2022.
Sep 8, 2021
Added statement and link to article about container images being marked Deprecated when moving into ELS phase.
Aug 31, 2021
Updated the examples of versions and how they relate to EAP 7 versus versions 5 and 6.
Aug 30, 2021
Changed many instances of "Middleware" to "Application Services"
Aug 30, 2021
Clarified that customer needing patches and troubleshooting support must be on the latest minor release of a product.