The one place for your designs
Upload and view the latest designs for this issue. Consistent and easy to find, so everyone is up to date.
Minor changes and content additions:
/estimate 1h 30m
We want to be sure it is you, please confirm you are not a robot.
added Sprint::09/11 - Nuanced Numbat scoped label
assigned to @omadrid
added Squad::Blue scoped label
added Product::Docs scoped label
added Status::InProgress scoped label
added Type::Chore scoped label
changed milestone to %Misc. Q3 2019
changed time estimate to 1h 30m
changed the description 7 times within 4 minutes
Upload and view the latest designs for this issue. Consistent and easy to find, so everyone is up to date.