A few weeks ago, I published a piece in City Metric contrasting two ways of through-running regional rail, which I identify with the RER A and C in Paris. The RER C (or Thameslink) way is to minimally connect two stub-end terminals pointing in opposite directions. The RER A (or Crossrail) way is to build long city-center tunnels based on urban service demand but then connect to legacy commuter lines to go into the suburbs. Crossrail and the RER A are the two most expensive rail tunnels ever built outside New York, but the result is coherent east-west regional lines, whereas the RER C is considerably more awkward. In this post I’d like to explain what this means for New York.
As I said in the City Metric piece, the current plans for through-running in New York are strictly RER C-style. There’s an RPA project called Crossrail New York-New Jersey, but the only thing it shared with Crossrail is the name. The plan involves new Hudson tunnels, but service would still use the Northeast Corridor and LIRR as they are (with an obligatory JFK connection to get the politicians interested). I alluded in the piece to RER A-like improvements that can be done in New York, but here I want to go into more detail into what the region should do.
Regional rail to Lower Manhattan
Regional rail in New York should serve not just Midtown but also Lower Manhattan. Owing to Lower Manhattan’s intense development in the early 20th century already, no full-size train stations were built there in the era of great urban stations. It got ample subway infrastructure, including by the Hudson Tubes (now PATH), but nothing that could be turned into regional rail. Therefore, regional rail plans today, which try to avoid tunneling, ignore Lower Manhattan entirely.
The Institute for Rational Urban Mobility, longtime opponent of the original ARC project and supporter of through-running, even calls for new tunnels between Hoboken and Midtown, and not between Hoboken and Lower Manhattan. I went to an IRUM meeting in 2009 or 2010, when Chris Christie had just gotten elected and it was not clear what he’d do about ARC, and when people pitched the idea, I asked why not go Hoboken-Lower Manhattan. The reply was that it was beyond the scope of “must connect to Penn Station” and at any rate Lower Manhattan wasn’t important.
In reality, while Midtown is indeed a bigger business district than Lower Manhattan, the job density in Lower Manhattan is still very high: 320,000 people working south of Worth Street in 1.9 km^2, compared with 800,000 in 4 km^2 in Midtown. Nothing in Ile-de-France is this dense – La Defense has 180,000 jobs and is said to have “over 800 jobs/ha” (link, PDF-p. 20), and it’s important enough that the RER A was built specifically to serve it and SNCF is planning a TGV station there.
Regional trains to Lower Manhattan are compelled to be more RER A-style. More tunnels are needed than at Penn Station, and the most logical lines to connect create long urban trunks. In a post from two years ago, I consistently numbered the regional lines in New York 1-5 with a non-through-running line 6:
- The legacy Northeast Corridor plus the Port Washington Branch, via the existing Hudson tunnels.
- More lines in New Jersey (some Northeast Corridor, some Morris and Essex) going to the New Haven Line via new Hudson tunnels and Grand Central.
- Some North Side LIRR lines (presumably just Hempstead and the Central Branch) to the Hudson Line via Penn Station and the Empire Connection; some LIRR trains should terminate at Penn Station, since the Hudson Line can’t support as much traffic.
- The Harlem Line connecting to the Staten Island Railway via Lower Manhattan and a Staten Island-Manhattan tunnel, the most controversial piece of the plan judging by comments.
- The New Jersey lines inherited from the Erie Railroad (including the Northern Branch) to the South Side LIRR (to Far Rockaway, Long Beach, and Babylon) via Lower Manhattan.
- More North Side LIRR lines (probably the Ronkonkoma and Port Jefferson branches) to Grand Central via East Side Access.
The Lower Manhattan lines, numbered 4 and 5, have long trunks. Line 4 is a basic north-south regional line; it’s possible some trains should branch to the Hudson Line, but most would stay on the Harlem Line, and it’s equally possible that the Hudson Line trains to Grand Central should all use line 2. Either configuration creates very high all-day frequency between White Plains and St. George, and still high frequency to both Staten Island branches, with many intermediate stations, including urban stops. Line 5 goes northwest-southeast, and has to have, at a minimum, stops at Pavonia, Lower Manhattan, Downtown Brooklyn, and then all the LIRR Atlantic Branch stops to and beyond Jamaica.
More stops within new tunnels
Even new tunnels to Midtown can be built with the RER A concept in mind. This means more stations, for good connections to existing subway and bus lines. This is not superficially obvious from the maps of the RER A and C: if anything, the RER C has more closely-spaced stops within Paris proper, while the RER A happily expresses from La Defense to Etoile and beyond, and completely misses Metro 5 and 8. Crossrail similarly isn’t going to have a transfer to every Underground line – it’s going to miss the Victoria and Piccadilly lines, since connecting to them would have required it to make every Central line stop in the center of London, slowing it down too much.
However, the important feature of the RER A is the construction of new stations in the new tunnels – six of them, from La Defense to Nation. The RER C was built without any new stations, except (later) infill at Saint-Michel, for the transfer to the RER B. The RER C’s urban stations are all inherited legacy stations, even when underground (as some on the Petite Ceinture branch to Pontoise are), since the line was built relatively cheaply, without the RER A’s caverns. This is why in my City Metric piece, I refer to the RER B as a hybrid of the RER A and C approaches: it is a coherent north-south line, but every station except Saint-Michel is a legacy station (Chatelet-Les Halles is shared with the RER A, Gare du Nord is an existing station with new underground platforms).
With this in mind, there are several locations where new regional rail tunnels in New York could have new stations. I wrote two years ago about Bergenline Avenue, within the new Hudson tunnels. The avenue hosts very high bus and jitney frequency, and today Manhattan-bound commuters have to go through Port Authority, an obsolete structure with poor passenger experience.
Several more locations can be identified. Union Square for line 4 has been on the map since my first post on the subject. More stations on line 5 depend on the alignment; my assumption is that it should go via the approach tracks to the Erie’s Pavonia terminal, but if it goes via Hoboken then there should be a station in the Village close to West 4th Street, whereas if it goes via Exchange Place then there should be a station at Journal Square, which is PATH’s busiest New Jersey station.
On lines 4 and 5, there are a few additional locations where a station should be considered, but where there are strong arguments against, on the grounds of speed and construction cost: Brooklyn Heights, Chinatown (on line 5 via Erie, not 4), a second Lower Manhattan station on line 4 near South Ferry (especially if the main Lower Manhattan station is at City Hall rather than Fulton Street).
There are also good locations for more stations on the Metro-North Penn Station Access routes, both the New Haven Line (given to line 1) and the Hudson Line (given to line 3). Current plans for Penn Station Access for the New Haven Line have four stations in the Bronx, but no connection to Astoria, and a poor connection to the Bx12 buses on Fordham Road. A stop on Pelham Parkway would give a stronger connection to the Bx12 than the Coop City station, which the Bx12 reaches via a circuitous route passing through the 6 train’s northern terminus at Pelham Bay Parkway. Astoria has been studied and rejected on two grounds: one is construction difficulties, coming from the constrained location and the grade; the other is low projected ridership, since current plans involve premium fares, no fare integration with the subway and buses, and low off-peak frequency. The first problem may still be unsolvable, but the second problem is entirely the result of poor industry practices.
On the Empire Connection, there are plans for stops at West 62nd and West 125th Street. It is difficult to add more useful stations, since the line is buried under Riverside Park, far from Upper West Side and Washington Heights development. The 125th Street valley is one of few places where urban development reaches as far west as the Empire Connection. That said, Inwood is low-lying and it’s possible to add a station at Dyckman Street. In between, the only semi-plausible locations are 145th Street or 155th-158th (not both, they’re too close), and even those are marginal. All of these neighborhoods, from West Harlem north, have low incomes and long commutes, so if it’s possible to add stations, Metro-North should just do it, and of course make sure to have full fare integration with the subway and buses. The one extra complication is that there are intercity trains on this line and no room for four-tracking, which limits the number of infill stops that can support high frequency (at worst every 10 minutes).
Infill stops on existing lines
The existing regional lines in New York have very wide stop spacing within the city. It’s a general feature of North American commuter rail; I wrote about it 5 years ago in the context of Chicago, where Metra is even more focused on peak suburb-to-CBD commutes than the New York operators. In most North American cities I heartily endorse many infill stops on commuter rail. I have a fantasy map for Los Angeles in which the number of stops on inner commuter rail lines triples.
However, New York is more complicated, because of the express subway lines. In isolation, adding stops to the LIRR west of Jamaica and to Metro-North between Harlem and Grand Central would be a great idea. However, all three lines in question – Metro-North, the LIRR Main Line, and the Atlantic Branch – closely parallel subway lines with express tracks. It’s still possible to boost urban ridership by a little by having a commuter rail stop for each express subway stop, which would mean 86th and 59th Streets in Manhattan and Utica Avenue in Brooklyn, but the benefits are limited. For this reason, my proposed line 4 tunnel from Grand Central down to Lower Manhattan has never had intermediate stations beyond Union Square. For the same reason, while I still think the LIRR should build a Sunnyside Junction station, I do not endorse infill elsewhere on the Main Line.
That said, there are still some good candidates for infill. Between Broadway Junction and Jamaica, the LIRR parallels only a two-track subway line, the J/Z, which is slow, has poor connections to Midtown (it only goes into Lower Manhattan), and doesn’t directly connect Jamaica with Downtown Brooklyn. The strongest location for a stop is Woodhaven Boulevard, which has high bus ridership. Lefferts is also possible – it hosts the Q10 bus, one of the busiest in the borough and the single busiest in the MTA Bus system (most buses are in the New York City Transit bus division instead). It’s 4.7 km from Woodhaven to Broadway Junction, which makes a stop around Logan or Crescent feasible, but the J/Z is much closer to the LIRR west of Crescent Street than east of it, and the A/C are nearby as well.
Another LIRR line that’s not next to a four-track subway is the inner Port Washington Branch. There are no stops between the Mets and Woodside; there used to be several, but because the LIRR had high fares and low frequency, it could not compete once the subway opened, and those stations all closed. There already are plans to restore service to Elmhurst, the last of these stations to be closed, surviving until 1985. If fares and schedules are competitive, more stations are possible, at new rather than old locations: Queens Boulevard with a transfer to a Triboro RX passenger line, and two Corona stops, at Junction Boulevard and 108th Street. Since the Port Washington Branch is short, it’s fine to have more closely-spaced stops, since no outer suburbs would suffer from excessive commutes as a result.
Beyond Jamaica, it’s also possible to add LIRR stops to more neighborhoods. There, the goal is to reduce commute length, which requires both integrated fares (since Southeast Queens is lower middle-class) and more stops. However, the branches are long and the stop spacing is already not as wide as between Jamaica and Broadway Junction. The only really good infill location is Linden Boulevard on the Atlantic Branch; currently there’s only a stop on the Montauk Line, farther east.
In New Jersey, the situation is different. While the stop spacing east of Newark is absurdly long, this is an artifact of development patterns. The only location that doesn’t have a New Jersey Transit commuter rail stop that could even support one is Harrison, which has a PATH station. Additional stations are out of the question without plans for intense transit-oriented development replacing the warehouses that flank the line. A junction between the Northern Branch and line 2, called Tonnelle in my post on The Transport Politic from 2009, is still feasible; another stop, near the HBLR Tonnelle Avenue station, is feasible on the same grounds. But the entire inner Northern Branch passes through hostile land use, so non-junction stations are unlikely to get much ridership without TOD.
West or south of Newark, the land use improves, but the stop spacing is already quite close. Only two additional locations would work, one on the Northeast Corridor near South Street, and one on the Morris and Essex Lines at the Orange Street stop on the Newark Subway. South Newark is dense and used to have a train station, and some area activists have hoped that plans to extend PATH to the airport would come with a South Street stop for additional urban service. At Orange Street the land use isn’t great, since a highway passes directly overhead, but the Newark Subway connection makes a station useful.
Finally, in Manhattan, the East River Tunnels have four tracks, of which Amtrak only needs two. This suggests an infill East Side station for the LIRR. There are strong arguments against this – namely, cost, disruption to existing service, and the fact that East 33rd Street is not really a prime location (the only subway connection there is the 6). On the other hand, it is still far denser than anywhere in Brooklyn and Queens where infill stations are desirable, and the 6’s ridership at 33rd Street is higher than that of the entire Q10 or Bx12.
Conclusion
The RER A and Crossrail are not minimal tunnels connecting two rail terminals. They are true regional subways, and cost accordingly. Extracting maximum ridership from mainline rail in New York requires building more than just short connections like new Hudson tunnels or even a Penn Station-Grand Central connection.
While some cities are blessed with commuter rail infrastructure that allows for coherent through-service with little tunneling (like Boston) or no tunneling at all (like Toronto), New York has its work cut out for it if it wants to serve more of the city than just Jamaica and the eastern Bronx. The good news is that unlike Paris and London, it’s possible to use the existing approaches in Brooklyn and New Jersey. The bad news is that this still involves a total of 30 km of new tunnel, of which only about 7 are at Penn Station. Most of these new tunnels are in difficult locations – underwater, or under the Manhattan CBD – where even a city with reasonable construction costs like Paris could not build for $250 million per km. The RER A’s central segment, from Nation to Auber, was about $750 million/km, adjusted for inflation.
That said, the potential benefits are commensurate with the high expected costs. Entire swaths of the city that today have some of the longest commutes in the United States, such as Staten Island and Eastern Queens, would be put within a reasonable distance of Midtown. St. George would be 6 minutes from Lower Manhattan and perhaps 14 from Grand Central. Siting infill stations to intersect key bus routes like Bergenline, Woodhaven, and Fordham, and making sure fares were integrated, would offer relatively fast connections even in areas far from the rail lines.
The full potential of this system depends on how much TOD is forthcoming. Certainly it is easier to extract high ridership from rapid transit stations that look like Metrotown than from ones that look like typical suburban American commuter rail stops. Unfortunately, New York is one of the most NIMBY major cities in the first world, with low housing growth, and little interest in suburban TOD. Still, at some locations, far from existing residential development, TOD is quite likely. Within the city, there are new plans for TOD at Sunnyside Yards, just not for a train station there.
The biggest potential in the suburbs is at White Plains. Lying near the northern terminus for most line 4 trains, it would have very good transit access to the city and many rich suburbs in between. It’s too far away from Manhattan to be like La Defense (it’s 35 km from Grand Central, La Defense is 9 km from Chatelet-Les Halles), but it could be like Marne-la-Vallee, built in conjunction with the RER A.
Right now, the busiest commuter lines in New York – both halves of the Northeast Corridor and the LIRR Main Line – are practically intercity, with most ridership coming from far out. However, it’s the inner suburbs that have the most potential for additional ridership, and middle suburbs like White Plains, which is at such distance that it’s not really accurate to call it either inner or outer. The upper limit for a two-track linear route with long trains, high demand even in the off-peak hours, and high ridership out of both ends, is around a million riders per weekday; higher ridership than that is possible, but only at the levels of overcrowding typical of Tokyo or Shanghai. Such a figure is not out of the question for New York, where multiple subway lines are at capacity, especially for the more urban lines 4 and 5. Even with this more limited amount of development, very high ridership is quite likely if New York does commuter rail right.