Status of Fukushima Daiichi Nuclear Power Station

  • Important Report from TEPCO

    The Tokyo Electric Power Company, Incorporated, would like to make comments on subjects that are reported by the newspapers, TV or websites.
  • Mid-and-long-Term Roadmap towards the Decommissioning of Fukushima Daiichi Nuclear Power Units 1-4

    Mid-and-long term roadmap towards the reactor decommissioning at Fukushima Daiichi Nuclear Power Station developed by the Government-TEPCO Mid-and-long Term Response Council
  • Fukushima Nuclear Accidents Investigation Report

    This report was summarized with an eye on what is necessary for ensuring nuclear safety, and the important lessons learned will be incorporated into our future business operation.
  • The Great East Japan Earthquake and Current Status of Nuclear Power Station

    Overview of the earthquake, the Tsunami and the accident, lessons learned from the earthquake and countermeasure implementation
  • Press release

  • Countermeasures for Water Leakage

Status of Fukushima Daini Nuclear Power Station

  • Current condition of each unit

    The progress status of permanent restoration of the equipments/facilities maintaining plant cold shutdown proceeded based on the restoration plan is posted.
  • Press release

Topics

August 5, 2013
[ Data ][ Fukushima daiichi ]

Data

Fukushima daiichi

Monitoring post (original/ temporary/ monitoring car) measurement data

-Exhaust Stack Monitor
-The Monitoring Results at a time Airlock is Opened at the Reactor Building
-Monitoring results related to the nitrogen injection to Primary Containment Vessel of Unit 3

Survey map (Reactor Building, Area around buildings, entire power station site)
Results of Water Level Measurement at Sub-drain Pits (around Units 1-6, around Central Radioactive Waste Treatment Facility, Layout of Sub-drains)
Result of Radioactive Analysis around Fukushima Daiichi Nuclear Power Station
(Air, Seawater, in the ocean soil off the coast, water treatment facility etc)
The parameters related to the plants in Fukushima Daiichi Nuclear Power Station
Plant Data of Fukushima Daiichi NPS at the time of the Tohoku-Chihou-Taiheiyou-Oki Earthquake
Situation of water level, transfer and treatment of the accumulated water
* Please click here for the archives.
Fukushima daini Monitoring post (original) measurement data
Monitoring at the exhaust stack
Monitoring at the discharge channel

File

  • Handouts at press conference
  • Photos and Video Library
  • Videos
  • Other related documents

Live Camera

Videos

Official Twitter Account of TEPCO

Official Facebook Page of TEPCO

Official YouTube Channel of TEPCO

Internal exposure dose measurement for the emergency workers who have never measured their internal exposure dose
Contact information for the emergency workers at Fukushima Daiichi Nuclear Power Station who have never measured their internal exposure dose and have lost contact