Wed 09-April-2008 DAY
Calendar

# Time Comment
1 14:25
Target on GPS FE #372 (Laser Test target, W, surface)
Massmarker: Cs,Rb, Ga
FE/Target is now beeing pumped. /ME
2 15:52
Vacuum sequence stopped at status "17", Henrik is looking for a solution/modification of the PLC microcode (same thing yesterday for HRS). /ME
3 16:54
Robots:
HRS robot would not respond to the pendant since last years run. After severe investigations we found one wire on the PP connector at the robot side lose (resoldered it) and problems with bad connections between the pins of the connector (contact spray helped).
All connections and wiring tested as well as the interface box translating the RS232 to RS422 for distance communication (between robot CR and zone). /ES/RC
4 17:56
Water leak!
Water coming into the target-zone from the drains plus in the hall dripping down in large amounts from the ventilation room. Coming from the target-cooling water reservoir above the ICR in 170/197. During tests of the new water panel several fillings of the reservoir were carried out. Apparently when filling the pressure is too high making the water to get over the sides of the tank: Under investigation. R.Mollay and team sur place as well as the pompiers, both in the ventilation room (reservoir) as target zone. /ES/ME
FAULTS
# Group Fault Element Description Begin End Duration
NO FAULT